歡迎訪問中科光析科學(xué)技術(shù)研究所官網(wǎng)!
免費(fèi)咨詢熱線
400-635-0567
感應(yīng)數(shù)據(jù)通信設(shè)備檢測項(xiàng)目報(bào)價(jià)???解決方案???檢測周期???樣品要求? |
點(diǎn) 擊 解 答??![]() |
1.0.1為規(guī)范電子工程建設(shè)的基本術(shù)語及其定義,實(shí)現(xiàn)術(shù)語標(biāo)準(zhǔn)化,制定本標(biāo)準(zhǔn)。1.0.2本標(biāo)準(zhǔn)適用于電子工程建設(shè)的規(guī)劃、咨詢、設(shè)計(jì)、工程監(jiān)理、工程管理等工程服務(wù)以及教學(xué)、科研及其他相關(guān)領(lǐng)域。1.0.3電子工程建設(shè)文件、圖紙、科技文獻(xiàn)使用的術(shù)語,除應(yīng)符合本標(biāo)準(zhǔn)外,尚應(yīng)符合現(xiàn)行有關(guān)標(biāo)準(zhǔn)的規(guī)定。
本標(biāo)準(zhǔn)規(guī)定了民用航空空中交通管制語音通信交換系統(tǒng)(以下簡稱空管語音通信交換系統(tǒng))的測試條件及測試用儀器和器件、功能測試、性能測試、技術(shù)指標(biāo)測試和工作環(huán)境測試的方法要求。本標(biāo)準(zhǔn)適用于空管語音通信交換系統(tǒng)的檢驗(yàn)。
本標(biāo)準(zhǔn)規(guī)定了電力系統(tǒng)同步數(shù)字系列光纜傳輸系統(tǒng)的設(shè)計(jì)要求,電力特種光纜線路設(shè)計(jì)以及光纖通信站設(shè)計(jì)等規(guī)定和要求。本標(biāo)準(zhǔn)適用于新建SDH干線光纜通信工作設(shè)計(jì)。改建、擴(kuò)建和支線SDH光纜通信工程設(shè)計(jì),可參照本標(biāo)準(zhǔn)執(zhí)行。本標(biāo)準(zhǔn)適用于利用架空輸電線路敷設(shè)的光纖復(fù)合架空地線(OPGW),加掛于架空輸電線路的非金屬自承式光纜(ADSS)等特種光纜通信工程的設(shè)計(jì)。
This Recommendation extends the scope of the ITU-T J.84 \"Distribution of digital multiprogramme signals for television, sound and data services through SMATV/MATV networks\" to make provisionfor bidirectional data over SMATV/MATV coaxial networks for int
The present document applies to Close Range Inductive Data transmitters and receivers operating at 13,56 MHz. The present document contains the technical characteristics for radio equipment and is referencing in CEPT/ERC Recommendation 70-03 [2] and ERC Decisions. The present document does not necessarily include all the characteristics which may be required by a user, nor does it necessarily represent the optimum performance achievable. It is a specific product standard covering specific close range inductive data equipment: - with an inductive loop antenna; - with an antenna connection and/or with an integral antenna; - for alarms, identification systems,
The present document covers the minimum characteristics considered necessary in order to make the best use of the available frequencies. It does not necessarily include all the characteristics that may be required by a user, nor does it necessarily represent the optimum performance achievable. Close Range Inductive Data Communication equipment covered within the present document are considered by definition short-range devices. The power limits for frequency bands will be found in the current version of CEPT/ERC/Recommendation 70-03 [2] (or national regulations). The present document applies to Close Range Inductive Data transmitters and receivers operating
This International Standard provides requirements for the software of computer-based I&C systems of nuclear power plants performing functions of safety category A as defined by IEC 61226.According to the definition in IEC 61513, I&C systems of safety class 1 are basically intendedto support category A functions, but may also support functions of lower categories. Howeverthe system requirements are always determined by the functions of the highest category implemented.For software of I&C system performing only category B and C functions in NPP as defined by IEC 61226, requirements and guidance of IEC 62138 are applicable.This standard provides requirements for the purpose of achieving highly reliable software. Itaddresses each stage of software generation and documentation, including requirements specification, design, implementation, verification, validation and operation.The principles applied in developing these requirements include:– best available practices;– top-down design methods;– modularity;– verification of each phase;– clear documentation;– auditable documents;– validation testing.Additional guidance and information on how to comply with the requirements of the main part of this standard is given in Annexes A to I.
This standard sets down guidelines for the application, design concepts, and implementation of computer-based control systems for hydroelectric plant automation. It addresses functional capabilities, performance requirements, interface requirements, hardware considerations, and operator training. It includes recommendations for system testing and acceptance. Finally, case studies of actual computer-based automatic control applications are presented.\nThe automation of control and data logging functions has relieved the plant operator of these tasks, allowing the operator more time to concentrate on other duties. In many cases, the plant's operating costs can be significantly reduced by automation (primarily via staff reduction) while still maintaining a high level of unit control reliability.\nAutomatic control systems for hydroelectric units based on electromechanical relay logic have been in general use for a number of years and, in fact, were considered standard practice for the industry. Within the last decade, microprocessor-based controllers have become available that are suitable for operation in a power plant environment. These computer-based systems have been applied for data logging, alarm monitoring, and unit and plant control. Advantages of computer-based control include use of graphical user interfaces, the incorporation of sequence of events and trending into the control system, the incorporation of artificial intelligence and expert system capabilities, and reduced plant life cycle cost.